Hanging, Adjustment and Maintenance Points of Tractor and Seeder

Hanging and adjustment of tractor and seederMaintenance Points

(I) tractors

Selection of drive shaft and tractorPTO spline specifications shall match. Adjust the upper pull rod (central pull rod) and left and right lifting rods of the tractor to reach the horizontal state of the planter frame in both longitudinal and transverse directions. Adjust the limit screw of the lower suspension arm of the tractor to make the transverse center line of the seeder coincide with the longitudinal center line of the tractor. The pin shaft connecting the tractor suspension pull-down rod and the left and right hanger rods should be placed at the position of the long hole, so that the seeder can achieve the overall profiling effect when working. The hydraulic system distributor should be placed in a floating position when the tractor is working. The matching length of the drive shaft should not be less than 200mm.

(II) seeder (taking air suction type as an example)

1. Adjust the rack height. Before the seeder is formally operated in the field, the height of the beam frame of the seeder should be adjusted first, so as to leave a certain amount of profiling on the profiling mechanism on the seeding monomer, and avoid the damage of parts or the depth of seeding caused by the weight of the whole machine. The height of the supporting wheel is adjusted by rotating the supporting wheel adjusting screw, so that the sowing frame is raised or lowered, and the fertilization depth of the fertilization parts is ensured to be suitable.

2. Adjust sowing spacing. Adjust the row spacing of planters according to local agronomic requirements. During adjustment, the center line of the beam frame of the seeder is taken as the reference line, and the single seeding unit and the fertilizing and ditching parts are moved in series symmetrically to the left and right. At the same time, the support wheel, transmission mechanism and fertilizer discharge box shall also be adjusted accordingly. The moved parts should be re-tightened.

3. Adjust the amount of fertilizer. Crop variety, number of seedlings per mu (ridge spacing and plant spacing) and soil fertility determine the amount of fertilizer applied per mu. According to the requirements of the amount of fertilizer applied, the amount of fertilizer discharged by the fertilizer discharging device shall be determined based on 10 turns of the support wheel, and then the amount of fertilizer discharged per mu (slip rate shall be calculated at 10%) shall be calculated until the amount of fertilizer discharged per mu is adjusted.

4. Adjust the depth of fertilization. One method is to adjust the support wheel of the planter so that the frame reaches a certain height to adjust the depth of fertilization; the other method is to directly move the fertilization opener handle and pressure spring in series to adjust the depth of the fertilization opener.

5. Replacement and adjustment of seed plate. According to the sowing of different crops, different seed plates shall be replaced, the corresponding seed plates shall be replaced according to the requirements of the operating instructions of the seed meter, the corresponding parts shall be installed completely, and after the seed meter is adjusted, the test run shall be carried out to check whether each seed meter is operating normally.

6. Adjustment of sowing spacing. The adjustment of sowing spacing is to adjust the transmission system of the planter. Most of the transmission systems of the planter are completed by chain transmission. The corresponding adjustment can be made according to the sowing table in the instruction manual, and the corresponding chain wheel is hooked and tensioned.

7. Adjustment of sowing depth. Adjust the depth limit pointer handle on each seeding monomer, and make the depth limit pointer on each seeding monomer at the same scale position during operation to ensure the consistent seeding depth of the whole machine. However, in the actual operation of sowing operation, limited by different soil preparation conditions and soil environment, the actual sowing depth should be measured after sowing depth adjustment. Once the indicated sowing depth is inconsistent with the actual sowing depth, secondary fine adjustment should be carried out to achieve the effect of consistent sowing depth.

8. Adjust the fan belt. After checking whether the fan and the seeding frame are firmly and safely connected and fixed, check the tension degree of the fan belt. The belt tension should not be too loose or too tight. The operation method is to loosen the lock nut fixing the large pulley, then adjust the length of the tension screw. When the belt tension is moderate, lock the adjusting screw with a nut, and finally lock the lock nut fixing the large pulley.

(III) seeder (air suction type as an example) matters needing attention in operation

1. The seeds and fertilizer shall be loaded into the seed box and fertilizer box after the unit arrives at the sowing site. If it is added before departure or field transfer, the weight of the planter will increase and the center of gravity of the whole unit will move backward, which is not conducive to transportation. At the same time, the seed and fertilizer will be compacted in vibration during transportation, which is not conducive to the uniform discharge of seed and fertilizer. In addition, check whether there are tools or other sundries left in the box before packing.

2. Trial sowing and debugging shall be carried out before the seeder is officially used. When debugging sowing, pay attention to the working conditions of each component at any time, observe the operation of each rotating component, whether the transmission sprocket and chain operate normally, whether the seed guiding pipe and fertilizer discharging pipe are blocked, whether the fertilizer in the fertilizer box is in an overhead state, detect the sowing plant spacing, row spacing and sowing depth, and finally adjust the relevant values to the state required by agronomy before normal sowing operation can be carried out.

3. Before the start of the unit, the fan should be connected and the tractor should work with the high throttle. When the unit turns in the field, the fan should reduce the speed and continue to operate to ensure that the seeds already adsorbed in the seed meter will not fall and waste seeds.

4. When the seeder starts the operation, the seeder should be dropped while walking. The seeder should not be put into the soil violently, so as to prevent the working parts in the soil from being damaged due to severe impact, and at the same time to avoid blocking the seed guiding pipe mouth and the fertilization opener mouth.

5. When the seeder is working, it is necessary to monitor the transmission parts for abnormal noise. If any abnormality is found, it should be stopped in time for inspection, and the operation can be continued after troubleshooting.

6. The seeder is not allowed to make sharp turns and reverse during operation to avoid damage to the seeding parts.

7. When the planter turns in the ground, it should be raised to the highest level as far as possible, and the rear output shaft of the tractor should stop rotating to avoid damage to the seeding unit and the fan drive shaft.

8. When the planter arrives at the ground, it shall check the seed amount in the seed box and the fertilizer amount in the fertilizer box. The seed amount and fertilizer amount in the working process shall not be less than 25% of the total capacity, and shall be added in time when it is insufficient.

9. After the sowing machine is debugged, stop the machine for 3 hours to check whether the ditching parts are deformed and the bolts are loose, so as to ensure the sowing condition is in good condition.

10. The fan input speed is 540 r/min, and the fan pulley bearing should be oiled once every 12 hours to avoid burning the bearing due to lack of lubricating oil.

11. Attention should be paid to changes in sowing depth and sowing quantity at all times and adjustments should be made in time.

Source: Sangma dialect Liangzhou

Website: https://mp.weixin.qq.com/s/9sL-A8wJsiq-Yb28ynqkag




田间管理机械培训维修

Created on:2025-09-11

Hanging, Adjustment and Maintenance Points of Tractor and Seeder

Hanging and adjustment of tractor and seederMaintenance Points

(I) tractors

Selection of drive shaft and tractorPTO spline specifications shall match. Adjust the upper pull rod (central pull rod) and left and right lifting rods of the tractor to reach the horizontal state of the planter frame in both longitudinal and transverse directions. Adjust the limit screw of the lower suspension arm of the tractor to make the transverse center line of the seeder coincide with the longitudinal center line of the tractor. The pin shaft connecting the tractor suspension pull-down rod and the left and right hanger rods should be placed at the position of the long hole, so that the seeder can achieve the overall profiling effect when working. The hydraulic system distributor should be placed in a floating position when the tractor is working. The matching length of the drive shaft should not be less than 200mm.

(II) seeder (taking air suction type as an example)

1. Adjust the rack height. Before the seeder is formally operated in the field, the height of the beam frame of the seeder should be adjusted first, so as to leave a certain amount of profiling on the profiling mechanism on the seeding monomer, and avoid the damage of parts or the depth of seeding caused by the weight of the whole machine. The height of the supporting wheel is adjusted by rotating the supporting wheel adjusting screw, so that the sowing frame is raised or lowered, and the fertilization depth of the fertilization parts is ensured to be suitable.

2. Adjust sowing spacing. Adjust the row spacing of planters according to local agronomic requirements. During adjustment, the center line of the beam frame of the seeder is taken as the reference line, and the single seeding unit and the fertilizing and ditching parts are moved in series symmetrically to the left and right. At the same time, the support wheel, transmission mechanism and fertilizer discharge box shall also be adjusted accordingly. The moved parts should be re-tightened.

3. Adjust the amount of fertilizer. Crop variety, number of seedlings per mu (ridge spacing and plant spacing) and soil fertility determine the amount of fertilizer applied per mu. According to the requirements of the amount of fertilizer applied, the amount of fertilizer discharged by the fertilizer discharging device shall be determined based on 10 turns of the support wheel, and then the amount of fertilizer discharged per mu (slip rate shall be calculated at 10%) shall be calculated until the amount of fertilizer discharged per mu is adjusted.

4. Adjust the depth of fertilization. One method is to adjust the support wheel of the planter so that the frame reaches a certain height to adjust the depth of fertilization; the other method is to directly move the fertilization opener handle and pressure spring in series to adjust the depth of the fertilization opener.

5. Replacement and adjustment of seed plate. According to the sowing of different crops, different seed plates shall be replaced, the corresponding seed plates shall be replaced according to the requirements of the operating instructions of the seed meter, the corresponding parts shall be installed completely, and after the seed meter is adjusted, the test run shall be carried out to check whether each seed meter is operating normally.

6. Adjustment of sowing spacing. The adjustment of sowing spacing is to adjust the transmission system of the planter. Most of the transmission systems of the planter are completed by chain transmission. The corresponding adjustment can be made according to the sowing table in the instruction manual, and the corresponding chain wheel is hooked and tensioned.

7. Adjustment of sowing depth. Adjust the depth limit pointer handle on each seeding monomer, and make the depth limit pointer on each seeding monomer at the same scale position during operation to ensure the consistent seeding depth of the whole machine. However, in the actual operation of sowing operation, limited by different soil preparation conditions and soil environment, the actual sowing depth should be measured after sowing depth adjustment. Once the indicated sowing depth is inconsistent with the actual sowing depth, secondary fine adjustment should be carried out to achieve the effect of consistent sowing depth.

8. Adjust the fan belt. After checking whether the fan and the seeding frame are firmly and safely connected and fixed, check the tension degree of the fan belt. The belt tension should not be too loose or too tight. The operation method is to loosen the lock nut fixing the large pulley, then adjust the length of the tension screw. When the belt tension is moderate, lock the adjusting screw with a nut, and finally lock the lock nut fixing the large pulley.

(III) seeder (air suction type as an example) matters needing attention in operation

1. The seeds and fertilizer shall be loaded into the seed box and fertilizer box after the unit arrives at the sowing site. If it is added before departure or field transfer, the weight of the planter will increase and the center of gravity of the whole unit will move backward, which is not conducive to transportation. At the same time, the seed and fertilizer will be compacted in vibration during transportation, which is not conducive to the uniform discharge of seed and fertilizer. In addition, check whether there are tools or other sundries left in the box before packing.

2. Trial sowing and debugging shall be carried out before the seeder is officially used. When debugging sowing, pay attention to the working conditions of each component at any time, observe the operation of each rotating component, whether the transmission sprocket and chain operate normally, whether the seed guiding pipe and fertilizer discharging pipe are blocked, whether the fertilizer in the fertilizer box is in an overhead state, detect the sowing plant spacing, row spacing and sowing depth, and finally adjust the relevant values to the state required by agronomy before normal sowing operation can be carried out.

3. Before the start of the unit, the fan should be connected and the tractor should work with the high throttle. When the unit turns in the field, the fan should reduce the speed and continue to operate to ensure that the seeds already adsorbed in the seed meter will not fall and waste seeds.

4. When the seeder starts the operation, the seeder should be dropped while walking. The seeder should not be put into the soil violently, so as to prevent the working parts in the soil from being damaged due to severe impact, and at the same time to avoid blocking the seed guiding pipe mouth and the fertilization opener mouth.

5. When the seeder is working, it is necessary to monitor the transmission parts for abnormal noise. If any abnormality is found, it should be stopped in time for inspection, and the operation can be continued after troubleshooting.

6. The seeder is not allowed to make sharp turns and reverse during operation to avoid damage to the seeding parts.

7. When the planter turns in the ground, it should be raised to the highest level as far as possible, and the rear output shaft of the tractor should stop rotating to avoid damage to the seeding unit and the fan drive shaft.

8. When the planter arrives at the ground, it shall check the seed amount in the seed box and the fertilizer amount in the fertilizer box. The seed amount and fertilizer amount in the working process shall not be less than 25% of the total capacity, and shall be added in time when it is insufficient.

9. After the sowing machine is debugged, stop the machine for 3 hours to check whether the ditching parts are deformed and the bolts are loose, so as to ensure the sowing condition is in good condition.

10. The fan input speed is 540 r/min, and the fan pulley bearing should be oiled once every 12 hours to avoid burning the bearing due to lack of lubricating oil.

11. Attention should be paid to changes in sowing depth and sowing quantity at all times and adjustments should be made in time.

Source: Sangma dialect Liangzhou